Reconstruction of Mingachevir-Bahramtapa Motorway,
Lot 1: Mingachevir-Mingachevir station
2015 - 2017

Technical Parameters and work volumes of the road:

Total length of the road
16,50 km
Width of traffic lane
3,75 m
Number of traffic lanes
2 lanes
Road pavement
168 000 m2
Thickness of asphalt-concrete pavement
270 mm
Earthworks (excavation and embankment)
307 000 m3
Capping layer
146 000 m3
Base course
66 700 m3
Asphalt-concrete mixture
107 000 tons
Number of bridges
1 ea

Construction works were started in January, 2016.

The motorway has been reconstructed and improved from third technical degree to second. At the result of construction the width of road bed has been enlarged from 12 m to 15 m. Within construction of Mingachevir-Bahramtapa motorway a single span bridge on Kurakchay river, 26 round pipes and other infrastructure works have been executed successfully.

With reconstruction of Mingachevir city – Mingachevir railway station easy movement of traffic to Baku-Alat-Gazakh-state border with Georgia has been provided.

Construction works were completed in July, 2017.