Construction of Lachin International Airport
2021 - 2024
Technical specifications:
Length of runway
3000 m
Width of runway (with shoulders)
60 m
Area of apron
45600 m2
Area of taxiways
8000 m2
Work volumes of aerodrome areas (runway, apron, taxiways, forecourt and internal roads):
Excavation works (with blast method)
19 200 000 m3
Embankment works
1 200 000 m3
Capping layer
85 000 m3
Base course
50 000 m3
Asphalt-concrete mixture
200 000 tons
Construction works are planned to be completed in the 2024.